STATION 15.10 (87L+87M – NEW A321 XLR AIRBUS)
15.10 A and B are two identical drilling stations for working on the new XLR structural assembly line in Hamburg for the production of the new A321 XLR series. The piece in production will be placed on the Keel Beam jig, positioned with the 4 sets of CWB jigs and the RCT jig. The labourer will be assisted in the operations and will have access to the production piece through the MLGB tower lift and the RPF floor grid. Subsequently, with the drill template, the labourer will proceed with the operations.