FUSELAGE POSITIONING SYSTEM – Station 40 and Station 41

The project involved the production, assembly and functional testing of Stations 40 and 41 of the Fuselage Positioning System, used to connect the two sides of the fuselage and manage its handling. In addition to the mechanics, the most complicated part of the project was certainly handling the input data – the only source being the 2D in Pdf format from the 2000s, without any possible 3D visualisation.